Tanks for the memory

Wednesday, April 18th, 2018

The first full week of resumed work at the Hayling Island boatyard building Team Britannia‘s round the world powerboat Excalibur produced some pretty impressive progress. First a bulkhead was welded into position, then the two forward fuel tanks, 6,000 litres capacity each, were manhandled into place and secured on beds of high-density rubber.

With the tanks in the bow, another bulkhead was welded behind them, followed by another further back, separating the main cabin area from the six-berth forward sleeping area. The main cabin area will actually be above the remaining four fuel tanks to go in – it will all make rather more sense when the already completed wheelhouse is welded into place on top of the hull.

And even as our ace welders from Latvia and Russia continue to work in confined spaces inside the boat, Team Britannia project leader and skipper Alan Priddy has concluded a deal with Technifast, a company manufacturing special mechanical fixings which will attach Excalibur’s enormous inflatable tubes around the sides of the boat.

At the current rate of progress, we’re hoping the boat will be in the water by late June or early July, at which point sea trials will begin, with one or two smaller world record runs before we base Excalibur in Gibraltar ready to tackle the big trip around the world.